The project included the DNO replacement of a single-phase transformer with a new two phase transformer. We were responsible for the installation of:
- A new 3 phase distribution board
- 113 solar photovoltaic panels
- 36kWh of battery storage
- All cabling and meters to connect the panels and storage to the grid
An earlier phase of the Ty Pant refurbishment installed a Ground Source Heat Pump (GSHP), supplying all the heating and hot water, a new well pump and water treatment system. The GSHP is electricity intensive, and this was one of the main drivers for installing the Solar and batteries.